FPSO HU Manager

iotagroup· BU TTE
Apply Now ↗

About this role

Company Description

The Suriname Block 58 development is a major deepwater offshore project led by our client, involving the installation and start-up of a new Floating Production Storage and Offloading (FPSO) unit and subsea production system. The project aims to deliver safe, efficient hydrocarbon production while minimizing environmental impact and reducing flaring and greenhouse gas emissions.

The FPSO HU Manager will play a key role during the execution phase, supporting the FPSO Package Manager in preparing the field for operations from Final Investment Decision (FID) through commissioning and start-up. The role involves close coordination with engineering, procurement, construction, installation, and operations teams to ensure the FPSO and subsea systems are safely integrated and ready for production.

Job Description

  • Support the FPSO Package Manager in the overall management of the FPSO package during execution.
  • Enforce the Company’s HSE culture with contractors and subcontractors during construction, integration, and commissioning phases.
  • Monitor cost control and schedule performance for the FPSO package.
  • Manage contract compliance, including change management, variation orders, and deliverables follow-up.
  • Lead planning and execution of hook-up, pre-commissioning, commissioning, and start-up activities.
  • Coordinate interfaces between the FPSO and other project packages, including subsea and field operations teams.
  • Ensure a smooth transition from project execution (EPSCC) to operations and maintenance (O&M).
  • Review technical documentation including operating philosophy, operating manuals, maintenance procedures, and SIMOPS dossiers.
  • Follow procurement and readiness of operational spare parts.
  • Support development of commissioning strategy and field operations organization.
  • Monitor contractor progress at fabrication yards and ensure alignment with the project integrated schedule.
  • Supervise risk management activities and support project control functions.
  • Ensure proper reporting to project management and manage potential claims, change orders, and contractual issues.
  • Contribute to lessons learned and project close-out documentation.

Qualifications

  • Minimum 20 years of experience in the Oil & Gas industry.
  • Proven experience in major offshore deepwater developments.
  • Strong experience with FPSO projects, particularly hook-up, commissioning, and start-up phases.
  • Experience with subsea production systems integration.
  • Background in mechanical, petroleum, or industrial engineering (Master’s degree or equivalent preferred).
  • Strong contract management and negotiation skills with contractors and suppliers.
  • Demonstrated ability to manage cost optimization and project performance.
  • Excellent communication and stakeholder management skills within multidisciplinary teams.
  • Ability to work autonomously with a proactive and solution-oriented mindset.
  • Willingness to travel to shipyards in Europe, China, and Suriname.
  • English required, French preferred.

Additional Information

Start: Asap

Duration : 1 Year renewable

Location : COSCO‐ CHINA yard

Frequently Asked Questions

Is the salary disclosed for the FPSO HU Manager position at iotagroup?
The salary for this FPSO HU Manager role at iotagroup is not publicly listed. Click "Apply Now" to learn more about the compensation package on their official careers page.
Where is the FPSO HU Manager position at iotagroup located?
This FPSO HU Manager role at iotagroup is based in cn, Jiangsu, Nantong, Nantong, Jiangsu, China. The position is listed as on-site or hybrid. Check the full job description or apply directly to confirm the work arrangement.
Is the FPSO HU Manager role at iotagroup full-time or part-time?
This is listed as a Full time position. It is posted as a FPSO HU Manager role in the BU TTE department at iotagroup.
Which team or department does the FPSO HU Manager at iotagroup belong to?
This FPSO HU Manager position is part of the BU TTE department at iotagroup. See the full job description for more information about the team structure and responsibilities.
How do I apply for the FPSO HU Manager position at iotagroup?
Click the "Apply Now" button on this page. You will be redirected to iotagroup's official application portal hosted on smartrecruiters where you can submit your application directly.
When was the FPSO HU Manager job at iotagroup posted?
This FPSO HU Manager position at iotagroup was posted on Jun 24, 2026. Apply as soon as possible — early applications are often reviewed first.
FPSO HU Manager
iotagroup
Apply for this role ↗

You'll be redirected to iotagroup's official application page on SmartRecruiters.