Consultant - Forensic Delay Analysis

Rimkus· Forensics
Apply Now ↗
🌍 Remote📍 TELECOMMUTE📍 United StatesFull time💰 USD 80K–110K

About this role

Join Rimkus and unlock your potential with endless opportunities for growth, learning, and making a difference!

Rimkus (www.rimkus.com) is a worldwide leader in Engineering and Technical Consulting. Rimkus experts specialize in building envelope, engineering, forensic consulting, dispute resolution, construction management services, and solutions built for the environment.

NOW IS THE TIME to join this growing and stable company! We offer our full-time employees a competitive salary, bonus opportunities and a full benefits package that includes medical, dental, vision, life, disability, employer-matching 401(k), and opportunities for advancement!

Overview:

As a Consultant within the Delay and Damages group, you will focus on Forensic Delay Analysis and work Subcontractor Default, Surety, Professional Liability, Builders Risk, Delay-In-Startup, Forensic Delay Analysis, Loss of Productivity and other complex construction claims and disputes. Responsibilities will include performing various methods of Forensic Delay Analysis on construction projects and various cost and quantum related analysis on construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors around the world.

The Salary Range for this position is $80,000 to $110,000 and is dependent on education, experience, location and certifications/licensure.

ESSENTIAL JOB FUNCTIONS:

  • Performing Forensic Delay Analysis on construction project schedules and producing written forensic reports detailing the findings.
  • Performing contract, change order, cost overruns, and quantum-related analysis on complex construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors and producing written forensic reports detailing the findings.
  • Managing and supporting in the research and analysis of contemporaneous project documentation.
  • Managing multiple projects and coordinating with other support team members to produce client reports in a timely manner.

REQUIRED EXPERIENCE, EDUCATION and CERTIFICATIONS:

  • Bachelor’s degree in engineering, architecture, or construction management.
  • 5-7+ years of experience performing CPM scheduling and cost analysis work.
  • Knowledge of Architecture, Civil, Structural, MEP, Building Enclosure systems and designs for commercial, retail, and high-rise residential buildings.
  • Experience in the analysis of construction claim damages including delay damages.
  • Proficiency in P6® scheduling software, experience with MS Project® and Asta®.
  • Proficiency in 3rd party schedule analysis software.
  • Proficient in Microsoft Office products such as PowerBI, Excel, Word, and PowerPoint.
  • Working knowledge of AutoCAD, Revit, Outlook, Word, and BlueBeam.
  • Experience coordinating with disciplines internally as well as externally with consultants /architects.
  • Experience conducting and attending construction sites, as well as preparing site reports.

Preferred SKILLS and ABILITIES:

  • Testifying experience is a plus for any candidate. If not, we will train and prepare you for this.
  • Experience with estimating software.

PHYSICAL DEMANDS, OVERTIME, and TRAVEL: 

  • Physical Demands - Work will be performed both in an office setting and at outside locations (i.e., Client’s office, industrial, construction, and/or residential sites). Employee is frequently required to stand, sit, climb ladders, bend, balance, stoop, kneel, crouch, talk, hear, and drive a motor vehicle to job sites. Employee may occasionally lift and/or move up to 50 pounds of equipment. Employee must be attentive, focused, and alert when conducting site inspections, speaking, and interacting with clients, preparing drawings and written reports. Clear vision and depth perception are also necessary.
  • Overtime - This position is classified as salaried with an exempt FLSA status. Regular working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, with one hour for lunch. There will be periods where overtime will be required, which the employee will need to comply with to meet the demands of the position.
  • Travel Requirements - This position requires up to 25% travel.  Some out-of-area and overnight travel may be required.

At Rimkus, we value a diverse and inclusive workplace where all employees feel valued and respected. We are committed to creating a work environment that supports and celebrates the unique perspectives and experiences of all employees. If you share our commitment to diversity and inclusivity and are excited about joining a welcoming and supportive team, we encourage you to apply for our open positions.

Rimkus is an Equal Employment Opportunity (EEO) Employer and will make all employment-related decisions without regard to race, color, religion, sex, sexual orientation, gender identity, genetic information, national origin, disability, or protected veteran status. 

THIS JOB DESCRIPTION IS SUBJECT TO CHANGE AND DOES NOT CONSTITUTE A CONTRACT FOR EMPLOYMENT OR A GUARANTEE OF CONTINUED EMPLOYMENT.

Rimkus works with a limited number of approved recruiting partners. All agency submissions must be made through our designated submission process. Unsolicited resumes will not be recognized.

  • Health Care Plan (Medical, Dental & Vision)
  • Retirement Plan (401k, IRA)
  • Life Insurance (Basic, Voluntary & AD&D)
  • Paid Time Off (Vacation, Sick & Public Holidays)
  • Family Leave (Maternity, Paternity)
  • Short Term & Long Term Disability
  • Training & Development
  • Work From Home

Frequently Asked Questions

What is the salary for the Consultant - Forensic Delay Analysis role at Rimkus?
The listed salary for this Consultant - Forensic Delay Analysis position at Rimkus is USD 80K–110K. This is a remote Full time role.
Is the Consultant - Forensic Delay Analysis job at Rimkus remote?
Yes, this Consultant - Forensic Delay Analysis position at Rimkus is remote, with team members based in TELECOMMUTE, United States. You can work from home or anywhere in the supported regions.
Is the Consultant - Forensic Delay Analysis role at Rimkus full-time or part-time?
This is listed as a Full time position. It is posted as a Consultant - Forensic Delay Analysis role in the Forensics department at Rimkus.
Which team or department does the Consultant - Forensic Delay Analysis at Rimkus belong to?
This Consultant - Forensic Delay Analysis position is part of the Forensics department at Rimkus. See the full job description for more information about the team structure and responsibilities.
How do I apply for the Consultant - Forensic Delay Analysis position at Rimkus?
Click the "Apply Now" button on this page. You will be redirected to Rimkus's official application portal hosted on workable where you can submit your application directly.
When was the Consultant - Forensic Delay Analysis job at Rimkus posted?
This Consultant - Forensic Delay Analysis position at Rimkus was posted on Apr 15, 2026. Apply as soon as possible — early applications are often reviewed first.
Consultant - Forensic Delay Analysis
Rimkus · 💰 USD 80K–110K
Apply for this role ↗

You'll be redirected to Rimkus's official application page on workable.